Toolkit · Contractor pack

Contractor design pack

Planning briefs for every trade, drawn from your layout: fire sprinklers (ceiling, in-rack and mezzanine, with an insurer checklist), lighting, emergency lighting and power, fire alarm, escape, HVAC, slab, drainage, docks, CCTV and Wi-Fi. Each rule names its standard; quantities are allowances to quote against.

Fire exits & escape routes

Exits come from your drawing (doors / fire exits), the layout dock doors, or default exits at the building corners. Mark exits in the layout Drawing panel (mode "Doors / fire exits"). Travel limits are planning assumptions from Approved Document B / BS 9999 and can be edited.

MHE dimensions & VNA end of aisle (used for aisle, door, mezzanine, dock and traffic checks; typical, confirm with truck supplier)

Edit in the MHE selector · Traffic routes: Your data / Layout & Drawings.